|
| Company
Name |
Description |
Web Link / Sample Shots |
| Last
updated on
Wed, March 28, 2007 7:32 AM
|
Client Photo Galleries
|
select a name and click GO to view a photo gallery of client work |
|
 |
| Beads Wholesale Filemaker System |
An elaborate Contact, Invoice. Inventory management system |
 |
 |
top |
| Filemaker Menus |
A tour of Main Menus for several many of the systems created by MACC |
 |
top |
Filemaker/Lasso
update to FM 8 Fall Winter 2006 |
Updated a FM 6 system to Filemaker 8 and integrated it with a legacy Lasso/FM 6 system |

I did quite a bit of updating in this one - see the before and after shots here |
top |
Filemaker/Lasso
Calendar Tracking System
Summer 2004
|
Uses a filemaker
calendar with colorcoding to track projects |

Demo
created for a large retail chain to track their advertising deadlines
Click here to see demo
Choose August or September for the demo
screen grabs:
Menu
August
September
Gantt
Detail |
top |
Safeway
Job Request & Tracking System 2003-2004
|
Ongoing project
to request, update and report Advertising Vehicles for Safeway.
Created originally in CDML the migrated to Lasso 6 & Filemaker.
|
|
top |
|
MSES online
Chemical Control System
2001-2003
|
Ongoing
project to post and maintain chemical Inventories online for California
schools. |
|
top |
Civic Solutions
Timesheet/Proj. Mgmt Database web system
|
A project
updating an in-house database system and adding a web interface for
timesheets and projects via CDML, Filemakers built in web language |
|
top |
CANHR or
California Advocates for Nursing Home Reform
2001-2002
|
A year-long
project to place their databased information system on-line via Filemaker
and Lasso-site is viewable at the web link shown; sample pictures
of their in-house DBMS shown in sample shots |

&

Membership Menu
Kwikfind
Membership Notes
Gifts Summary
Main Menu
Info Entry
Message logs
Report / Set Finder
Group Messages |
top |
| CURRENT!
Lute Society of America
The History of the lute
2002 |
Built the website to excite interest
in the just published "History of the lute" - used a filemaker
database to extract online orders from a cgi form |
|
top |
|
BSource.com |
FMPro consulting, development of reporting for MySQL database. |
|
top |
|
California Snow |
Database for managing survey information |
http://www.californiasnow.com/ details page
|
top |
|
Civil Society Forum |
Client and Project managment system; System is Bi-Lingual triggered
by a simple radio button; Spanish layout is shown. |
|
top |
|
Fibre Trade Inc. |
Inventory System |
|
top |
|
Global CareGuide, Inc |
Elaborate
systems for dealing with information from website |
|
top |
|
Grace.com/ Grace Cathedral |
Developed
web interface using CDML and the Lasso; trained staff to switch website
to Lasso run system; developed system for dynamic events page on web
site. |
http://www.GraceCathedral.org/
(site management has since changed to an outside agency)
Listing
Details
|
top |
| Heathy
Start Network |
Elaborate
Client, forms, reporting system |
|
top |
| Hopscotch
Press |
Enhanced
existing sytem into fully relational database |
|
top |
| Imagine
Media-DB |
Y2K
work, Database systems for magazine placents and Inventory sysem |
|
top |
| Kaiser
Permanente |
consulted
with in-house FMP developer for FMP forms calcuations and reports |
|
top |
| Low
Income Housing Fund |
reporting
system to integrate with legacy database system |
|
top |
National
Aids Mem. Grove |
enhanced
existing FMP system |
|
top |
|